Construction process for cast-in-situ piles (bored piles). Author: Engr. Dibakar Dey, IIT-Kharagpur, India
Construction Process of Cast-in-Situ Piles (Bored Piles)
Pre-checking and General Information:
Among deep foundation or pile foundation systems, the cast-in-situ pile is a widely used, easily accessible, and economical method. It involves excavating a hole of a specific diameter and depth into the ground, followed by casting with reinforced cement concrete (RCC). In cases where the soil has a low load-bearing capacity, these piles transfer the structural load to a stronger, deeper soil stratum; such piles are known as "end-bearing piles."
In our country, cast-in-situ piling is primarily carried out using two methods:
√ Hydraulic Rotary Pile Drill Rig Machine.
√ Piling Winch Machine / Manually Operated Rig Machine.
Today’s discussion focuses on piling work using a Winch Machine/Rig Machine. Here are the things you need to check before starting the work:
Pre-checking
* Is the diameter of the cutter or chisel correct?
Keep in mind that the diameter of the chisel is a critical factor; if it deviates from the specified dimension, the required volume of concrete will also be affected (resulting in either an excess or a deficit). Typically, the diameter of the chisel is slightly smaller than the diameter of the pile by about 1 to 1.5 inches, up to a maximum of 2 inches. For instance, if the pile diameter is 20 inches, the diameter of the cutter or chisel should be 18.5 inches or at a minimum 18 inches.
Note: If the diameter of the chisel is found to be too small, you must increase it by welding rods (8 to 16 mm in diameter) onto the outer perimeter of the chisel; otherwise, the chisel must be replaced.
* Are the lengths of the drilling pipe and the tremie pipe correct?
You must ensure that the lengths of the tremie and drilling pipes are slightly greater than the length of the pile—at least 2 meters (or 6 feet) longer.
N.B.: The diameter of the drilling pipe is typically 6 inches, while the diameter of the tremie pipe is usually between 8 and 12 inches.
* Are the length and diameter of the casing pipe correct?
It is better to have a slightly longer casing; however, never allow a length of less than 6 meters (18 feet). The diameter of the casing should be the same as the diameter of the pile.
General points to keep in mind (if not specified in the drawings):
1. The minimum compressive strength of the concrete shall be 17.25 MPa (2500 psi), with a mix ratio of 1:1.5:3 (using stone chips and 70% Sylhet sand).
2. The clear cover shall be 3 inches. The slump shall be between 100 mm (minimum) and 200 mm (maximum) (the use of an admixture is mandatory).
3. The minimum center-to-center distance between piles shall be 750 mm (2.5 feet) or 2.5 times the pile diameter. There must be a minimum distance of 100 mm (4 inches) from the outer face of the pile to the outer edge of the pile cap.
4. The length of the "false casting" (sacrificial concrete) above the cut-off level and extending to the bottom of the rebar casing shall be at least 600 mm (2 feet).
5. After breaking the pile head, the reinforcement bars must extend 2 to 3 inches above the concrete surface (cut-off level).
6. Casting must be completed within 6 hours of the completion of boring; otherwise, the borehole must be re-bored to an additional depth of 0.5 meters and then washed again. If, for any reason, casting cannot be performed in the excavated borehole, a new pile must be bored at a distance of 2D–3D (where D is the pile diameter) from the original hole.
7. Each pile must contain at least six 16mm longitudinal bars. The spiral reinforcement must have a minimum diameter of 8mm. The maximum spacing shall be the smallest of the following values:
(Core diameter / 6), 3.5 to 7.5 cm, or 8 times the diameter of the longitudinal bars; however, in no case shall the spacing exceed 6 inches.
8. Formula for determining the length of a spiral: N * π(D + d) + 8d [where N = total number of spiral turns, D = core diameter, d = diameter of the spiral bar, and π = 3.1416]. However, based on my practical experience, the length of each spiral turn does not differ significantly from πD (where D is the diameter of the pile, excluding the clear cover).
Maximum Tolerance:
√ Pile Center Displacement: 75mm/ 3 inches.
√ Vertically Inclination: 1:100 or 1 inch/ 10 feet