The Function of Stirrups/Tie Bars in Beams and Columns:
In beams and columns, ring-like reinforcement is commonly used referred to as "tie bars" in the case of columns and "stirrups" in the case of beams. There are several reasons for using these tie bars or stirrups.
Ties in Columns:
1. To protect highly stressed columns from buckling.
2. To hold the main reinforcement of the column in its proper position.
3. To maintain the alignment of the main bars during the placement of concrete in the column.
4. To prevent the main bars from bending or buckling.
Functions of stirrups in a beam:
1. To carry excess shear force.
2. To hold the main reinforcement bars of the beam in their designated positions.
3. To control/resist diagonal tension in the beam.
4. To prevent the main bars from bending or buckling.
5. To help form a cage (reinforcement framework) for casting the beam into its designed shape and dimensions.
6. While longitudinal bars resist the horizontal component of the diagonal forces generated by diagonal tension, stirrups are provided to resist the corresponding forces on the other side.
#Use of Brick Chips and Stone Chips
Both stone chips and brick chips are used in house construction. Some important aspects regarding the use of stone chips and brick chips are outlined below.
How can high-quality concrete be produced using brick chips?
Brick chips contain a high volume of voids.
Consequently, in our country, the structural integrity of buildings constructed with concrete—mixed based on mere estimation—often begins to decline after 10–15 years.
1. To obtain high-quality concrete using brick chips, the proportions of cement and sand must be increased.
2. To achieve 3500 PSI concrete using brick chips, the mixing ratio should be 1:1.5:2.5, rather than the standard 1:2:4 volumetric ratio.
3. Care must be taken when selecting brick chips; chips made from well-burnt, red-colored bricks yield better-quality concrete compared to those made from yellowish (under-burnt) bricks.
4. The brick chips must be thoroughly washed before use.
5. Using PCC (Portland Composite Cement) instead of OPC (Ordinary Portland Cement) will yield better results in this case.
6. The amount of water to be added should be determined by measuring the slump value at one-hour intervals. A slump value between 50 mm and 100 mm facilitates easier concrete mixing, placement, and subsequent compaction.
How can high-quality concrete be produced using stone chips?
1. The stone chips used for making concrete should not be thin, flat, or prone to expansion.
2. The stone chips should consist of a combination of various sizes.
3. The voids (gaps) between larger stone chips are filled by smaller-sized chips.
4. To obtain a well-graded coarse aggregate, it is best to use 12 mm and 20 mm stone chips in a 40:60 ratio.
5. Stone chips must be washed before use.
Cement Strength vs. Concrete Strength
There is a common misconception that if the cement is of good quality, everything else will be fine implying that everything depends solely on the strength of the cement. In reality, however, this is not the case.
.
Using high-quality cement alone does not guarantee high-quality concrete. To achieve concrete with the proper strength, the quality of all its other ingredients not just the cement is equally important.
.
The strength and quality of concrete depend on factors such as the proper water-cement ratio, aggregate grading, the quality of aggregates and water, the correct mix proportions, and curing. It should be remembered that concrete is composed of a combination of all these various components.
.
By employing an accurate mix design—that is, using the correct proportions of all ingredients while maintaining high quality standards—it is possible to produce concrete of the same strength, even when using cement from two different brands (provided the quality is the same).
Furthermore, due to an incorrect mix design or a failure to maintain quality standards, concrete of varying strength levels can be produced even when using cement from the same brand or the same bag.
.
It should be remembered that concrete is composed of various ingredients, which together form the floors, slabs, columns, and beams in our buildings with a specific level of structural strength.
Therefore, to ensure concrete achieves the proper strength, one cannot focus solely on the cement; attention must also be paid to the other components and criteria involved in the concrete mix.
Details on Fair-Faced Concrete:
Fair-faced concrete refers to concrete that, once the formwork is removed, possesses a surface so smooth that it requires no additional finishing, such as plastering.
With the passage of time, both interior and exterior design have evolved through the introduction, modification, and refinement of various materials—all with a focus on aesthetics and durability. One such material is "fair-faced plaster." It can be applied to both interior and exterior surfaces. When fair-faced plaster is used, there is no need for additional painting; it is visually appealing and long-lasting.
How is 'fair-face' plaster prepared?
'Fair-face' is a high-performance, cement-based type of plaster. It is essentially a blend of 60% white cement and 40% grey cement, with the addition of stone chips as required.
Application of Fair-Face Plaster:
Fair-face plaster is applied to dry brick walls. The process for applying fair-face plaster is similar to that of standard sand-cement plaster. It can also be applied over an existing layer of standard plaster; in such cases, the surface of the standard plaster must first be roughened.
Durability:
The thickness of the 'fair-faced' plaster is 8 millimeters. It has a bright, ash-grey appearance. Being cement-based, it results in an extremely smooth and glossy finish. Once applied, it lasts a lifetime.
Groove:
While it can be used for both interior and exterior applications, it is more commonly used on the exterior. Grooves can be incorporated as desired when applying fair-faced plaster. Typically, a 1–2 inch groove is provided at intervals of every 2 feet, though these dimensions can be adjusted as preferred.
Curing:
It is advisable to carry out curing for three to seven days after completing fair-face plastering work. This prevents the formation of hairline cracks in the plaster.
Where can you find it in Bangladesh?
In Bangladesh, you can find premixed 'fair-face' plaster powder from several international brands.
These include Conmix (Dubai), BASF (Germany), and Dr. Fixit and Fosroc (India).
Among these, the Dubai-based company Conmix has established a strong reputation for marketing its construction chemicals globally, including in Bangladesh.
You can also find fair-face plaster by checking with large tile showrooms.
Cost:
Generally, the work can be carried out at a rate of 140 to 145 Taka per square foot. However, for work on the exterior of high-rise buildings, scaffolding must be erected, which may incur an additional cost of 5 Taka per square foot.
Due to its exceptionally smooth appearance, elegant aesthetic, and unique beauty, the demand for this finish is steadily increasing in Bangladesh. You will notice 'fair-faced plaster' used on many buildings in the upscale areas of Dhaka city. It is as durable as it is beautiful, designed to last for generations.
# Grade Beam:
Once the work on the footings and short columns is complete, prepare for the construction of the grade beams.
Work Procedure:
1. First, fill the gaps between the footings and the short columns with sand and compact it thoroughly.
2. Next, install the column ties (rings) along the short columns, extending 3 feet down from their cast tops. (This is necessary because, once the grade beam reinforcement is in place, it will no longer be possible to install ties within the space occupied by the depth of the grade beam.)
3. Next, fill the area along the line of the grade beams with sand, lay a solid base of flat-laid bricks (brick flat soling), and seal the gaps between the bricks using a cement-sand mortar. (Ensure that the soling is laid while strictly maintaining a consistent water level.)
4. Now, install the steel reinforcement (rebar) according to the structural drawings.
5. It is mandatory to provide hooks (bends) at the ends of the main reinforcement bars. While it is preferable to also include hooks for the 'extra top' bars, it is not strictly required.
6. For the top layer of reinforcement bars in the grade beam, provide a lap length of 30D. Do not place the lap within the L/4 zones; instead, position it in the middle section. (Ensure that a staggered lap arrangement is used.)
7. For the bottom layer of reinforcement bars in the grade beam, provide a lap length of 40D. Place the lap within the L/4 zones; do not position it in the middle section. (Ensure a staggered lap arrangement.)
8. Next, install the stirrups in the grade beam, ensuring they are spaced correctly and positioned vertically (straight). Place the hooked ends of the stirrups along the top layer of the grade beam, and ensure the hooks are oriented in an alternating pattern.
9. Now, begin the shuttering process.
10. If using wooden shutters, line them with thin polythene sheeting; this will ensure a better quality of concrete pour.
11. Once the shuttering is properly set up, secure the edges by placing battens at intervals of 2 to 2.5 feet. Additionally, brace the shutters firmly using 2" x 2" timber struts to prevent them from bursting or leaking concrete when a vibrator is used.
12. Ensure the shuttering extends at least 2 inches above the intended depth of the grade beam to facilitate the concrete pouring process.
13. Use 2.5-inch CC (cement concrete) blocks for the grade beams.
14. Finally, thoroughly clean the grade beam area before commencing the concrete pour.
15. If a construction joint is required in a grade beam, it must be placed within a distance of L/4 from the column, or slightly away from the column. Never place a joint in the middle of a beam.
16. Ensure the concrete mix follows the correct ratio.
17. Before pouring concrete, thoroughly wet the brick soling with water so that the bricks do not absorb water from the concrete mix.
18. Begin curing the grade beam by applying water 24 hours after the concrete pour is completed.
After 48 hours, remove the side shuttering (formwork) from the grade beam, wrap it with jute fabric (hessian cloth), and continue curing for 14 days.
Questions and Answers Regarding Staircases:
Specifications:
8. Staircase length = 15'-6", width = 8'-0". Main reinforcement: 12 mm diameter bars at 4" center-to-center (C/C) spacing. Extra top reinforcement: 12 mm diameter bars at 4" C/C spacing; length of extra top bars = landing length + L/4. Binder bars: 8" C/C spacing. Waist slab thickness = 6". Tread = 10", Riser = 6". A T-beam is provided beneath the intermediate landing.
Beam size: 10" x 18". Roof beams located above do not extend into the staircase area. Beam reinforcement: 6 bars of 20 mm diameter. Beam stirrups (rings): 10 mm diameter at 6" C/C spacing. Beam anchorage (L-bend/hook): 6".
Length of the staircase = (4'-0" + 9 treads + 4'-0") = (4'-0" + 9 x 10" + 4'-0") = 15'-6"
Width = (3'-10" + 4" + 3'-10") = 8'-0"
Length of the stair waist slab (according to the Pythagorean theorem) = sqrt{(4'-6")2 + (8'-4")2} = 9'-6"
Here, height = 4'-6"
Base = 10 . 0'-10" = 8'-4"
Concrete Pouring (Volume)
Beam = 8'-0" 0'-10" 1'-0" = 6.64
Landing = 8'-0" 4'-0" 0'-6" x 2 = 32.00
Waist Slab = 9'-6" 3'-10" 0'-6" x 2 = 36.39
Steps = 1/2 0'-6" 0'-10" 3'-10" 18 = 15.10
Total = 90.13 cubic feet
Materials:
Dry volume = 90.13 x 1.5 = 135.20 cubic feet
Ratio 1:2:4, sum of the ratio components = (1+2+4) = 7
Materials
Cement = (135.20 x 1 ÷ 7) ÷ 1.25 = 15.45 bags
[Since 1 bag of cement = 1.25 cubic feet]
Sand = 135.20 x 2 ÷ 7 = 38.63 cubic feet
Coarse aggregate (brick chips/stone chips) = 135.20 x 4 ÷ 7 = 77.26 cubic feet
Length of main rod
= [(4'-0" + 9'-6" + 4'-0") - {(3/4" x 2) ÷ 12}] = 17'-6"
Length of binder rod = [3'-10" - {(3/4" x 2) ÷ 12}] = 3'-9"
Length of extra top rod = -3/4" + 4'-0" + (9'-6" ÷ 4) = 5'-17"
Length of landing binder = 8'-0" - (3/4" x 2 ÷ 12) = 7'-11"
Length of beam main rod = (8'-0") - (1.5" x 2) + (6" x 2) = 8'-9"
Length of ring rod = {(10 - 1.5 x 2) + (18 - 1.5 x 2)} x 2 + (3 x 2) = 4'-2"
Quantity of main rods = {(3'-10" x 12 - 3/4" x 2) ÷ 4} + 1 = 12.13 ≈ 13 rods
Total = 13 x 2 = 26 rods
Extra top bars = 13 × 4 = 52 bars
Number of landing binders = [{4'-0" × 12 - (3/4" × 2)} ÷ 8] + 1 = 6.81 ≈ 7 bars
Total = 7 × 2 = 14 bars
Number of binders for the double-layer mesh at the landing (calculated at 8" spacing) = (9'-6" × 12 ÷ 8) - 1 = 13.25 ≈ 14 bars
Total = 14 × 2 = 28 bars
Total number of rings = [{(8'-0") - (1.5" × 2)} ÷ 6"] + 1 = 16.50 ≈ 17 rings
Quantity of steel rods
Main Rods: 12 mm = 17'-5" x 26 x 0.27 = 122.29
Extra Top Rods: 12 mm = 6'-1" x 52 x 0.27 = 85.36
Landing Binders: 12 mm = 7'-11" x 14 x 0.27 = 29.94
Binders: 10 mm = 3'-9" x 28 x 0.19 = 19.95
Beam Main Rods: 20 mm = 8'-9" x 6 x 0.75 = 39.38
Beam Stirrups (Rings): 10 mm = 4'-2" x 17 x 0.19 = 13.47
Total quantity of steel rods = 310.39 kg
Total Shuttering
Beam sides: 8'-0" x 1'-0" x 2 = 16.00
Landing soffit (underside): 4'-0" x 8'-0" x 2 = 64.00
Landing sides: {(4'-0" + 8'-0" + 4'-0") x 0'-6"} x 2 = 16.00
Waist slab soffit (underside): 9'-6" x 3'-10" x 2 = 72.77
Waist slab sides: 9'-6" x 1'-0" x 4 = 38.00
Steps: 3'-10" x 0'-6" x 10 = 38.30
= 245.07 square feet
9. According to the ACI code, what are the maximum and minimum dimensions for a tread and a riser?
A: For staircases in residential buildings, the riser height is kept between 15 cm and 18 cm, and the tread depth is kept between 23 cm and 27 cm.
In public buildings, the riser height is kept between 14 cm and 15 cm, and the tread depth is kept between 25 cm and 30 cm.
10. What should be the minimum dimensions for the width and headroom of a stair flight in a residential building?
A: The width should be 90 cm (or 3 feet) and the headroom should be 2.10 m (or 7 feet).